25 November 2026

First shunt of the season

 It has been a while since the last post and four months since I ran a train on my layout. Life intervenes sometimes.

Today’s run was a modest shunt of my first branchline terminus, West Pilliga. There is a fair bit to shunt - a fuel siding, the mill, a stockyard and the goods shed/dump road. 4912 did the honours. It felt good to be back on the throttle.

The first shot shows the 49 easing a RU wagon into the shed at McLeod’s Mill.


Obviously the station staff have been picking up some extra overtime shifts if they are driving these late-model cars.


Shunting done, it is nearly time to head back to Dubbo. The modest loading suggests that this branch will be a candidate for closure when Commissioner Shirley comes along.







No comments:

Post a Comment